Environment Management Plan

Working of

Environment Management Plan

Environment Management Plan is required for ensuring sustainable development. JSL has established proper Environment Management Plan for Environment Aspects and proposed with proposed action plan.

01 - Planning
  • ⮞ Environmental Aspects
  • ⮞ Objectives & Targets
  • ⮞ Environment Management
02 - Implementation
  • ⮞ Implementation of EMP in all Divisions Sugar, Co-gen and Distillery.
  • ⮞ Document Control
  • ⮞ Operational Control
  • ⮞ Emergency Preparedness & Response.
03 - Checking/Corrective Aspect
  • ⮞ Monitoring Measurement
  • ⮞ Non-Conformance & Corrective Action
  • ⮞ Record
  • ⮞ EMS Audits
04 - Management Review
  • ⮞ Management Review
JSL has adopted most advanced treatment units for Pollution Control.
Effluent Generation:
  • ⮞ Sugar Unit: JSL has 400 CMD capacity ETP plant with primary, secondary and tertiary units.
  • ⮞ Distillery Division (Proposed): Raw spentwash will be primarily evaporated in Integrated Evaporation System followed by standalone Evaporation. Further it will be incinerated in advanced pollution control equipment i.e. 21 TPH incineration Boiler to achieve Zero Liquid Discharge.
Air Pollution Control:
  • ⮞ Cogeneration: Existing Air Pollution equipment wet scrubber.
  • ⮞ Incineration : Advanced Air Pollution control equipment Electrostatic Precipitator (ESP) will be installed for proposed incineration Boiler of Distillery with stack height of 69 Meters.
Solid Waste Management:
  • ⮞ Solid waste: Solid waste generated in form of Boiler ash generated from Baggass burning in Boiler is stored in Ash Pit and used as fertilizer by farmers.